Thursday, January 17, 2008

Progress Subfloor and site

The fencing company arrived on site yesterday evening at around half three, when they ran there lines for the fence it highlighted that they would need 7ft posts because of the way the site slopes. This meant an extra €.50 cent a metre so we are getting imported timber pressure impregnated 7ft 6x3 posts and 5x1 3/4 rails at 2.4metre spacings for €15.50 a metre.
On the way home from work last night i hired a petrol 2" water pump the father was due on site this morning to start laying blocks, so i was there till half 8 last night pumping water out of the foundations i eventually ran out of petrol and there was still plenty water in the foundations! €20/day for the hire of the pump!